1
/
of
6
Vesgantti
Vesgantti Queen Size Mattress, 10 Inch Innerspring Multilayer Hybrid Mattress, Ergonomic Design with Breathable Foam and Pocket Spring, Tight Top Series Medium Firm Feel
Vesgantti Queen Size Mattress, 10 Inch Innerspring Multilayer Hybrid Mattress, Ergonomic Design with Breathable Foam and Pocket Spring, Tight Top Series Medium Firm Feel
Regular price
$287.99 USD
Regular price
$287.99 USD
Sale price
Unit price
/
per
Shipping calculated at checkout.
Couldn't load pickup availability
Overview
- Brand : Vesgantti
- Size : Queen
- Product Dimensions : 80"L x 60"W x 10"Th
- Top Style : Tight Top
- Cover Material : Cotton
- Number of Layers : 5
- Fill Material : Memory Foam
- Special Feature : Orthopedic, Pressure Relief, Breathable, Low Motion Transfer, Cooling
- Color : White
- Coil Type : Pocketed Coil
- Item Weight 34 Pounds : Item Firmness Description Medium Firm
- : Item Weight 34 Pounds
- : Item Firmness Description Medium Firm
About this item
- Medium-Firm Feel: Fully expanded 75*39*10 inch(LWH) approx. Vesgantti luxury multi-layer foam and pocket spring support system provide medium firm yet comfortable feel. A great relief for those suffering from back and neck pains. Note: Please keep distance when opening the mattress from the plastic packing, as it may have a risk to hit back when restoring
- Individual Pocket Spring: Innovative zoned support system constructed by hundreds of individual pocketed stainless spring coils, each spring work independently to offer an all-over and even support to 7 parts of your body (Feet, legs, hips, waist, shoulders, neck, head). Excellent shock-absorption and resilience, cater your vertebra well, help adjust and correct your sleeping posture
- Breathable and Healthy: Designed with multi-layer foams, comfortable and breathable, providing good air circulation to dissipate sweat and moisture to keep body comfortable and dry when sleeping
- Ultra Quite: Due to the pocket spring + multi-layer foams design, this mattress can effectively absorb noise and vibration; No waken up caused by tossing and turning, no disturbing companion
- 【Vacuum Rolled Packed】- Delivery: vacuum sealed and neatly rolled in a box. Smaller size, easy to carry. Please allow 48 hours for the mattress to fully expand after unpacking. Thickness measurement tip: the distance from the height of the fully expanded foam to the bottom of the base.(Please note: once the mattress open and restore, it cannot be roll back again)
Share
